McDowall Affleck was engaged by Future Generation Joint Venture (FGJV) as part of the Snowy
Read moreMcDowall Affleck were engaged by City of Nedlands in 2020 to complete a new laneway
Read moreMcDowall Affleck was commissioned by Discovery Holiday Parks (The Big 4) as their Civil Engineering
Read moreThe Collector Wind Farm is located on the Cullerin Range between the Hume Highway and
Read moreIn November 2019, Enel Green Power engaged McDowall Affleck to undertake a Hydrological/Hydraulics Study of
Read moreIn November 2019, Enel Green Power engaged McDowall Affleck to undertake a Hydrological/Hydraulics Study of
Read moreIn December 2018, Tempo Engineering engaged McDowall Affleck to undertake the detailed design of the
Read moreMcDowall Affleck was commissioned by De Mol Group of Companies in liaison with the City
Read morePerth Airport is planning to develop their Airport Central Retail Precinct in readiness for future
Read morePerth Airport secured a leasing agreement for their Airport West site 6 with Costco.
Read more